John and his wife needed their house painted. John wanted to hired Tom to paint the house. Tom estimated it would take 40 hours of labor at 50.00 per hour and 20 gallons of premium paint at 20.00?

1 answer

Answer

1083374

2026-02-21 09:45

+ Follow

The total cost is 40hrs x 50 dollars P the cost of the paint. I am guessing the paint is 20 dollars a gallon so we add 20x20.

Then the total cost is 40x50+20x20=800+400=1,200 dollars.