The schedule value refers to the thickness of the wall of the pipe; the bigger the number (schedule) the bigger the wall thickness is of the pipe.
The thickness is relative to the diameter of the tube/pipe an the application it is being used in.
Copyright © 2026 eLLeNow.com All Rights Reserved.