The optimal way to schedule tasks within a given time frame to maximize efficiency and minimize conflicts is to prioritize tasks based on their duration and deadline, and then schedule them in a way that minimizes overlap and maximizes the use of available time slots. This is known as the interval scheduling problem.
Copyright © 2026 eLLeNow.com All Rights Reserved.