For a conventional slab, 3 1/2". If you go 3 1/2" on a post tension slab (and some builders do...) the tops of the cables will be just below the top of the surface and surface cracks will form above the cables. I have even seen where the power screed will cut into the black cable cover.
Copyright © 2026 eLLeNow.com All Rights Reserved.