LOAD FACTOR = AVERAGE LOAD ÷ PEAK LOAD AVERAGE LOAD = KW-HRS (ENERGY) ÷ NO. OF OPERATING HOURS IF THE LOCAL PUBLIC ELECTRIC COMPANY CANNOT SUPPLY A CERTAIN PLANT DURING PEAK HOURS -- THE SOLUTION IS TO USE A SECONDARY PRIME POWER FROM THE ENDUSER TO MEET DEMAND LOAD. IF THE ARRANGEMENT IS 12 HRS. FOR NORMAL POWER AND 12 HRS. FOR GENSET -- THE LOAD FACTOR IS THE SAME IF THE AVERAGE LOAD IS CLEARLY DEFINED.
Copyright © 2026 eLLeNow.com All Rights Reserved.