How do you calculate load factor when plant machinery is connected with two supply source ie one is from govt. electricity board supply and another is from diesel generator set supply?

1 answer

Answer

1048632

2026-03-08 06:45

+ Follow

LOAD FACTOR = AVERAGE LOAD ÷ PEAK LOAD AVERAGE LOAD = KW-HRS (ENERGY) ÷ NO. OF OPERATING HOURS IF THE LOCAL PUBLIC ELECTRIC COMPANY CANNOT SUPPLY A CERTAIN PLANT DURING PEAK HOURS -- THE SOLUTION IS TO USE A SECONDARY PRIME POWER FROM THE ENDUSER TO MEET DEMAND LOAD. IF THE ARRANGEMENT IS 12 HRS. FOR NORMAL POWER AND 12 HRS. FOR GENSET -- THE LOAD FACTOR IS THE SAME IF THE AVERAGE LOAD IS CLEARLY DEFINED.