The required working space for access to live parts operating at 300 volts to ground, where there are exposed live parts on one side and grounded parts on the other, is typically defined by the National Electrical Code (NEC). According to NEC guidelines, a minimum working space of 3 feet (or 1 meter) is generally required for such conditions. This distance ensures safety for workers and reduces the risk of electrical shock when working near live components. Always consult local codes and standards for specific requirements, as they can vary.
Copyright © 2026 eLLeNow.com All Rights Reserved.