How long does it take a mare to have a foal in months?

1 answer

Answer

1282658

2026-04-16 15:56

+ Follow

The maximum time it should take a mare to foal once she's began major contractions is 30 minutes. Any longer and the foal could be in serious trouble. Usually it should only take 10 minutes for the mare to foal on her own.

ReportLike(0ShareFavorite

Copyright © 2026 eLLeNow.com All Rights Reserved.