When is average cost minimized?

1 answer

Answer

1292806

2026-05-11 00:30

+ Follow

Average cost is minimized when marginal cost equals average cost. This occurs at the output level where the cost of producing one additional unit (marginal cost) is equal to the average cost of all units produced. At this point, producing additional units would either increase or decrease the average cost, indicating that the minimum average cost has been reached.