One of the required test and evaluation products at Milestone B is the Initial Operational Test and Evaluation (IOT&E) plan. This plan outlines the strategy for assessing the system's operational effectiveness, suitability, and survivability in a realistic operational environment. It ensures that the system meets the necessary performance requirements before moving into the production phase.
Copyright © 2026 eLLeNow.com All Rights Reserved.