How much cement is used in 1m3 of floor screed?

1 answer

Answer

1033422

2026-05-17 02:55

+ Follow

The amount of cement used in 1m³ of floor screed typically depends on the mix design, but a common ratio is 1 part cement to 4 parts sand (by volume). This generally translates to about 300-400 kg of cement per cubic meter of screed, depending on the specific requirements and intended use. For example, a standard mix might use around 350 kg of cement, along with sand and water for proper consistency. Always refer to specific project requirements for precise calculations.

ReportLike(0ShareFavorite