Sue shovels (1/40th) of the driveway each minute.
Tom does (1/55th) of the same job each minute.
Together, they do (1/40 + 1/55) = (11/440 + 8/440) = (19/440) of the job each minute.
It would take them (440/19) = 23.16 minutes to do the whole job together. (rounded)
Copyright © 2026 eLLeNow.com All Rights Reserved.