How long should I let water-based polyurethane dry before applying a second coat?

1 answer

Answer

1044391

2026-10-14 16:20

+ Follow

Water-based polyurethane typically needs to dry for about 2-4 hours before applying a second coat. It's important to follow the manufacturer's instructions for the specific product you are using to ensure proper drying time.

ReportLike(0)ShareFavorite

Copyright © 2026 eLLeNow.com All Rights Reserved.