What is the concrete yield per batch in cf?

1 answer

Answer

1281495

2026-09-05 18:21

+ Follow

The concrete yield per batch in cubic feet (cf) depends on the mix design and the volume of materials used. To calculate it, you can sum the volumes of all ingredients (cement, aggregates, water, and admixtures) in the mix. For example, if a batch consists of 1 cubic yard of concrete, it would yield approximately 27 cubic feet, as there are 27 cubic feet in a cubic yard. Adjustments may be necessary based on waste and spillage during mixing and pouring.