How much did the isle of man incinerator cost ot build?

1 answer

Answer

1011554

2026-08-08 00:30

+ Follow

The Isle of Man incinerator, also known as the Energy from Waste facility, cost approximately £20 million to build. It was designed to handle the island's waste and convert it into energy. The facility was officially opened in 2015 and aims to reduce landfill waste while generating electricity.

ReportLike(0ShareFavorite

Copyright © 2026 eLLeNow.com All Rights Reserved.