If it takes 42 minuites to load 3 12 trucks how many will it take to load 6 12 trucks?

1 answer

Answer

1037570

2026-07-27 03:06

+ Follow

If it takes 42 minutes to load 3 trucks, then loading 6 trucks, which is double the amount, would typically take twice as long. Therefore, it would take 42 minutes x 2 = 84 minutes to load 6 trucks.