The "Control" phase of DMAIC (Define, Measure, Analyze, Improve, Control) demonstrates that the solutions effectively solve the problem. In this phase, the improvements are monitored and controlled to ensure that the gains are sustained over time. It involves implementing control systems, such as process monitoring and standard operating procedures, to maintain the improvements and verify that the problem has been resolved.
Copyright © 2026 eLLeNow.com All Rights Reserved.