13.5 days
Rate of work for men = m
Rate of work for children = c
Therefore if we combine the rates:
m + c = 1/9
Since rate = work-done/time
Now m = 2c since rate of men is twice the rate of children
Similarly, c = m/2 (rearranging the above)
Equation becomes:
m + m/2 = 1/9
3m/2 = 1/9
3m = 2/9
m = 2/27
This is the rate at which men work.
For the men to complete the work, it will take x days.
Rate = work/time
Rate = work/x
Work is 1
Rate is 2/27
2/27 = 1/x
x = 27/2
x = 13.5
Copyright © 2026 eLLeNow.com All Rights Reserved.