It can be controlled by connecting the work lead to tha end of tha weld joint and than welding away from the work lead
The ARC blow can be controlled by connecting the work lead to the end of the weld join. Then you will have to weld away from the work lead.
Copyright © 2026 eLLeNow.com All Rights Reserved.