The installation process of engineered hardwood glue down flooring involves the following steps:
- Prepare the subfloor by ensuring it is clean, dry, and level.
- Apply a moisture barrier if necessary.
- Lay out the flooring to acclimate to the room's temperature and humidity.
- Start in a corner and apply adhesive to the subfloor using a trowel.
- Place the first row of flooring, ensuring it is straight and snug against the wall.
- Continue laying down rows of flooring, applying adhesive and staggering the joints.
- Use a tapping block and mallet to ensure each piece is securely in place.
- Trim the last row to fit using a saw.
- Allow the adhesive to dry according to manufacturer's instructions before walking on the floor.
ReportLike(0)ShareFavorite