Permethrin typically takes about 2 to 4 hours to dry on surfaces after application. However, for optimal effectiveness, it's generally advised to wait at least 24 hours before exposing treated areas to moisture or heavy use. Factors such as humidity, temperature, and air circulation can influence drying time. Always refer to the product label for specific instructions.
Copyright © 2026 eLLeNow.com All Rights Reserved.