"margin-bottom:.0001pt;text-align:justify;">Shortly after coming to
the throne the Pharaoh commanded his architects to prepare a burial
place in keeping with his status as a god-king. A site was chosen
west of the Nile in one of the existing pyramid sites. The royal
survey team set to work marking out the site. Great care was taken
in orientating the site to the four points of the compass and in
levelling the site to provide a foundation for Khufu's Great
Pyramid. When the slaves had cleared away the sand and cut the site
roughly to shape highly skilled masons were called in to level the
foundations. This was done by cutting a grid of channels and
filling them with water. The rock was then cut back to the water
level to make it perfectly flat. Finally the water was drained away
and the channels filled with rubble.
"margin-bottom:.0001pt;text-align:justify;">On the Great Pyramid,
for example, as many as 20,000 workers may have been involved. Some
of them were free men doing particular tasks such as masons, tool
makers, carpenters, scribes and slave overseers. The remainder and
by far the majority were slaves, naked slaves too low in status to
wear clothes.
"margin-bottom:.0001pt;text-align:justify;">Through Khufu's reign,
the construction site teemed with workers of all kinds hard pressed
to complete the monument before the king's death. Day after day,
year after year, the quarries buzzed with activity. Through the
dust the bodies of the quarry slaves stand out dark against the
yellow coloured stone. Gangs of slaves bore holes using primitive
drill bits and sand which acted as an abrasive. After they had
drilled cores deep enough to define a block on one side, they
packed the holes with pieces of porous wood and then doused it with
water. The wood expands so fast that the block splits out with a
crack. After the stone blocks are extracted from the quarry face
they are strapped onto sledges. A mark is made on the stone by a
scribe.
"margin-bottom:.0001pt;text-align:justify;">From dawn to dusk,
gangs of slaves drag the sledges loaded with stones each weighing
about 2.5 tons along roadways laid with wooden planks to staging
areas at the base of the pyramid. Water or oil is poured under the
runners of the sledges to ease their passage. Most of the stone
blocks proceed up the ramp without future handling. Only a fraction
of the stone blocks needed to be cut to precise dimensions by the
masons to retain the accurate alignment of the pyramid. The slaves
begin hauling the loaded sledges slowly up a long clay and rubble
ramp. By the time the pyramid is complete this ramp will nearly a
mile long. The noise here was one of chanting slaves and the rumble
of heavy sledges.
"margin-bottom:.0001pt;text-align:justify;">At the working level
teams of slaves called setters using simple levers and brute
strength shifted the blocks from the sledges into their designated
positions. Once the stones had been delivered the hauling gang
would make their way down the ramp carrying their sledge, in order
to make the same back breaking journey up as they would several
times a day. Their only substantial respite from this round of toil
in the hot sun was when they stopped for food, a meal of bread and
onions.
"margin-bottom:.0001pt;text-align:justify;">A number of slaves are
employed in maintaining and extending the ramp as the pyramid grew.
The ramp is made of rubble, bound together with desert tafla (a
type of clay) and laid with planks to ease the passage of the
ramps.
"margin-bottom:.0001pt;text-align:justify;">Rows of slave labourers
are seen breaking up waste material from the quarries, mixing them
with the desert tafla clay and loading the finished mixture into
baskets. Individual baskets are loaded onto the shoulders of slaves
for delivery to the ramp builders on the pyramid.
"margin-bottom:.0001pt;text-align:justify;">Boats made from reeds
deliver brilliant white limestone from Tura just across the river.
Here the slaves, in light provided by primitive lamps, toil in
manmade caves to obtain the best stone. This stone will be used for
the outer case of the pyramid. Once put in place and polished the
effect will be dazzling.
Granite often used
to line the burial chambers and on some pyramids the bottom course
was brought from Aswan over 400 miles (640 km) upriver on giant
barges made from reeds. Some of the granite stones from Aswan weigh
up to 70 tons. Copper chisels and drills used for quarrying
limestone could not be used on granite. Balls of dolerite, a hard,
black igneous rock, are used in the quarries of Aswan to extract
the hard granite. These dolerite "pounders" were used to pulverize
the stone around the edge of the granite block that needed to be
extracted. Teams of naked slaves would pound out the stone toiling
for hours on end in the blazing sun. At the bottom, they rammed
wooden pegs into slots they had cut, and filled the slots with
water. The pegs would expand, splitting the rock. Slaves would then
lower the blocks onto sledges. Long lines of straining slaves,
their naked bodies gleaming with sweat, drag the loaded sledges
along a causeway to the river where they will be loaded onto barges
and floated down the river.
Copyright © 2026 eLLeNow.com All Rights Reserved.