Cranes typically are designed with a FoS (Factor of Safety) of 5x the MBL (Minimum Breaking Load). So if the weakest part of the structure failed (e.g. in tension, compression or shear) at e.g. 100kN (10 metric tons), then the swl would be 10t / 5 = 2 tons
Copyright © 2026 eLLeNow.com All Rights Reserved.