Not exactly sure what your question is and you need to make sure you are in compliance with electrical code for your jurisdiction. But, generally speaking you install a large breaker (let's say 100A 2 pole breaker to power the sub panel) just as you would install any other breaker in the presently used (hot) panel, and the proper sized cable then goes from old to new and terminates on the main lugs of the new panel. Ground and neutral are usually isolated from each other in the sub panel but depends on other factors as to location of the sub panel, etc.
Copyright © 2026 eLLeNow.com All Rights Reserved.