What is the difference between risk assessment and job safety analysis?

1 answer

Answer

1216141

2026-03-12 21:51

+ Follow

JSA is a careful study for each step in a job, identifying the safety and health hazards at each step individually and classifying the severity and probability (H,M,L) for each hazard, identifying appropriate controls to eliminate or reduce each hazard.

Risk Assessment is evaluation of a hazard in an incident potential matrix and determine relative risk of different hazards as a way of prioritizing.