OSHA 1926.252 outlines the requirements for the disposal of waste materials in construction sites. It emphasizes that waste materials must be removed and disposed of in a manner that prevents hazards to workers and the environment. Additionally, the regulation mandates that containers used for waste must be clearly marked and maintained to avoid spills or contamination. Compliance with these standards helps ensure a safe and healthy work environment.
Copyright © 2026 eLLeNow.com All Rights Reserved.