It is defined as the time required between bales, or selection of bales within a laydown during the feed operation or the separation in time between the first and the last portion of cotton at any at any one process within a specified time interval. To achieve better blending , BDT should be as prolonged as possible.
Copyright © 2026 eLLeNow.com All Rights Reserved.