Which hazard control measure is the first to be considered for application?

1 answer

Answer

1168017

2026-02-26 16:50

+ Follow

The first hazard control measure to be considered should be "Eliminate the hazard" through replacement or substitution of the hazard source. After that, in order, they are: * Use engineering to control the hazard and prevent exposure of people to it. * Establish and apply administrative procedures to prevent people being exposed to the hazard. * Require the use of personal protective equipment.

ReportLike(0ShareFavorite

Copyright © 2026 eLLeNow.com All Rights Reserved.