How to calculate the cost of good manufactered?

1 answer

Answer

1011316

2026-04-27 06:21

+ Follow

To calculate the Cost of Goods Manufactured (COGM), start by determining the total manufacturing costs incurred during the period, which includes direct materials, direct labor, and manufacturing overhead. Next, add the beginning work-in-progress (WIP) inventory to these total costs and then subtract the ending WIP inventory. The formula can be summarized as: COGM = Total Manufacturing Costs + Beginning WIP - Ending WIP. This will give you the total cost of goods that were completed during the period.