Limit of retention is the maximum amount that can be retained in the construction contract. Suppose the retention % is 5% and limit of retention is 10%. On a contract value of Rs100.00. The first claim amounts to Rs20.00. Retention is Rs1.00 and net payment is Rs 19.00