How man days required for RR masonry for footing?

1 answer

Answer

1070716

2026-05-10 16:56

+ Follow

The number of days required for reinforced masonry (RR masonry) for footings typically depends on several factors, including the size of the footing, the complexity of the design, weather conditions, and labor availability. Generally, it may take anywhere from a few days to a week to complete the masonry work for footings, provided that the site is prepared and materials are readily available. Additionally, curing time for the concrete should also be considered, which can take several days before further construction can proceed.