What crane was used to float the gateshead millennium bridge into place?

1 answer

Answer

1184964

2026-04-15 08:15

+ Follow

The Gateshead Millennium Bridge was floated into place using a large floating crane known as the "Goliath." This crane was crucial for the installation process, as it allowed for the precise positioning of the bridge's sections over the River Tyne. The operation was a significant engineering feat, ensuring the bridge was properly aligned before being secured.