How many cubic meters of sand do you need to plaster 112 square meters of external walls?

1 answer

Answer

1082675

2026-06-01 08:30

+ Follow

The amount of sand required for plastering depends on the thickness of the plaster. Generally, a thickness of about 1 cm is common for external walls. Assuming a 1 cm thickness, you would need approximately 1.12 cubic meters of sand (calculated as 112 square meters × 0.01 meters). It's advisable to consult specific project requirements or guidelines for more accurate calculations.