The National Electrical Code (NEC) specifies requirements for bonding in Article 250, particularly in Section 250.24, which addresses bonding and grounding requirements. It indicates that bonding should occur downstream of the first means of disconnect to ensure that all equipment is effectively grounded and to enhance safety. Additionally, specific bonding requirements can be found in other sections depending on the type of installation, but the principle of bonding after the first disconnect is a general guideline in the NEC.
Copyright © 2026 eLLeNow.com All Rights Reserved.