How much did the materials cost at the time the the uss Arizona was built?

1 answer

Answer

1290088

2026-04-04 01:55

+ Follow

The USS Arizona was commissioned in 1916 and constructed at a cost of approximately $14 million, which included materials and labor. Adjusted for inflation, this amount would be equivalent to several hundred million dollars today. The costs encompassed a variety of materials, including steel, machinery, and armaments essential for a battleship of its time. However, specific detailed costs of individual materials are not typically documented in public records from that era.