A reduced level is the vertical distance between a survey point and the adopted level datum. There are two methods for calculating reduced levels, namely the "rise and fall" method and the "height of collimation" method. The latter reduces levels relative to the instrument height. As it has inferior built-in checks, it is unreliable.
Copyright © 2026 eLLeNow.com All Rights Reserved.