Divide one hour by the number of times the operation can be performed in that hour. 60 units per hour: 1/60= 0.0167 standard hour
Cost of the operation is the standard hour x number of workers x labor rate. For this example, with one person: 0.0167 x 1 x $18.50 = $0.309 per part
Copyright © 2026 eLLeNow.com All Rights Reserved.