It depends with the nature of labour in factory, if the labor is on daily basis or for specific number of units produced then it is variable cost but if labor has no connection with the volume of production of units then it is fixed cost as they have to pay no matter production is done or not.
Copyright © 2026 eLLeNow.com All Rights Reserved.