The overlapping CT (current transformer) connections in a bus section typically occur to ensure redundancy and enhance measurement accuracy. By providing multiple connections, it allows for the continuous monitoring of current even if one CT fails or is taken offline for maintenance. This design also helps in balancing the load distribution and improving the overall reliability of the electrical system. Additionally, overlapping connections can facilitate easier troubleshooting and maintenance activities.
Copyright © 2026 eLLeNow.com All Rights Reserved.